nounde·fects li·a·bil·i·ty pe·ri·odpronounced DEE-fekts ly-ə-BIL-ə-tee PEER-ee-əd
Last reviewed 16 April 2026
A short window, typically 3 to 6 months after a new build is handed over, during which the builder must fix any defects in workmanship or materials at no cost to you. This is separate from the longer statutory warranty.
During the defects liability period, we reported cracking in the garage slab and the builder fixed it at no cost to us within two weeks.
defect rectification period